NORTHGATE LIVABILITY PLAN |
|
Please scroll down this page to view current Council budget submissions made by Cr Kim Flesser and the list of ‘roads and drainage’ projects currently being considered for funding:-
Current budget submissions for Northgate made on behalf of Northgate Ward Residents:-
(Please note that these are only submissions - funding is subject to the Council budget processes).
* Widening of Pound Drain, to better handle floodwaters. * Redesign of the Flower St Park Skatebowl (Northgate). The existing skatebowl is too difficult to use for the vast majority of local users. * Traffic management for Northgate Road Northgate consider reducing speed limit to 50kph. * Resurfacing of Northgate Road adjacent to and across the rail crossing. * Upgrading of Progress Park Northgate – new play equipment, etc. * Resurfacing of Belmore St Northgate (also needs repairs to kerb and channelling). * Upgrading of the stormwater drain that runs between Parker Avenue and Carter Street, which drains a large area of Northgate East. * Traffic management for Gympie St Northgate. * Redesign of the Plaisted Place Skate Bowl (Northgate) to reduce the steep angles in the bowl to allow younger skaters to use the facility. * Widen the bridge on Nudgee Road at Northgate and provide footpaths for pedestrians and cyclists. * Undertake a traffic management plan for the area between Sandgate Road and Ryans Road Nundah and Northgate, with the view to implementing traffic management devices where appropriate. * Consider a Resident’s Parking Permit Scheme around the railway station. Encourgae QR to construct more off-street parking. * New bikeway along Cannery creek. * New bikeway from Nudgee Rd to the Jim Soorley Bikeway. * New bikeway from Edgar St to Nudgee Rd. * Cyclist/pedestrian bridge at Pound Drain adjacent to Nudgee Rd. * New bus shelter on Oates Pde near Stark Rd
Currently listed Roads and Drainage Maintenance Projects:-
Resurfacing Local Roads (Schedule 12)
Nansen St – 189m Station Ave – 185m
Road Construction - Minor (Schedule 13)
Acacia Ave – 330m Dethridge St – 7.5m
Road Resurfacing – Bus Routes (Schedule 16)
Day Rd – 475m
Road Resurfacing – Industrial Sts (Schedule 18)
Nil
Kerb and Channelling - new (Schedule 37)
Nil
Road Resurfacing - Major (Schedule 22)
Nil
Kerb and Channelling Reconstruction (Schedule 38)
Junior Tce – 268m Nansen St – 368m
Concrete Footpath - New (Schedule 44)
Buckle St – 150m Dethridge St – 176m Flower St – 440m Northgate Rd – 121m Oates Pde – 449m Olivia St – 173m Pole St – 126m Toombul Rd – 210m
Concrete Footpath reconstruction (Schedule 45)
Nil
Drainage Work - Minor (Schedule 68)
Edgar St – 70m Landy St – 114m Toombul Rd – 130m (from Edgar St to Lang Tce along south side) Toombul Rd – 151m (from Edgar St to No 238 along north side)
Drainage Work - Major (Schedule 72)
Parker Ave – (relief to existing capacity) Raubers Rd – (existing open drain is choked – carry out modifications)
Waterway Health Enhancement (Schedule 80)
Dethridge St – 900m Nudgee Rd – 0m (construct boulder protection along bank) Nudgee Rd – 1,250m
Landscaping Medians (Schedule 87)
Toombul Rd – 0m (remove existing pavers & replace with stamped concrete and landscaping)
|
|
Do you have local improvement suggestions for Northgate?
Any ideas for parks, roads, footpaths, bus services, library services, sewerage, stormwater or waste management?
If so, send an e-mail to Kim Flesser |
|
Check your own Livability Plan
|
|
Our Council Ward
Our Suburbs
|
|
Link to graphical image of ‘rolling’ Northgate Livability Plan - subject to change. |